PROJECT PROFILE

King’s Festival Shopping Center

PROJECT PROFILE

King’s Festival Shopping Center

kings-before-2
kings-before-1
kings-after-3

Project Description

The building owner decided to go with our complete restoration vs. tearing off the roof due to many factors. One of which was cost!

The owner was able to save a substantial amount of money with a restoration as opposed to a complete tear off of the existing roof system. The contractor recommended Tropical due to the added value TRP not only offer to the installer, but also to the Owner. Silicone was ideal for this low slope roof due to the fact it is much better at handling any ponding water that may occur vs. acrylic which is better for a roof that has a slope that prohibits standing water.

The EPDM membrane was extremely dirty after all of the years being subject to coastal conditions. The contractor took the time to follow our recommendation to clean the EPDM substrate thoroughly two (2) times.

Project Details

Roofing Contractor

Spann Roofing

Distributor

ABC Supply of Myrtle Beach/Conway

Project Size/Substrate

20 Sq Squares, the EPDM substrate was approximately twenty (20) years old and needed Restoration.

Condition

Leaks were starting to appear, and the EPDM membrane was starting to show deterioration due to its age.

Materials Used

SEALANTS

LEARN MORE >

TRP #652 UltraGreen Roof Wash All Purpose Cleaner

SEALANTS

LEARN MORE >

TRP #9400 Eterna-Sil Premium Silicone Mastic

COATINGS

LEARN MORE >

TRP #924 Eterna-Sil Premium Silicone Roof Coating

kings-hero
kings-after-4
Outcome

The roof has now been completed and all leaks have been eliminated. With the dry mil finish of .38 required for a twenty (20) year roof system, the building owner now has a new monolithic roof system (seamless) that they can depend upon for many years to come. Spann Roofing was extremely satisfied with the ease of application and the finished product. Both the building owner and the Contractor were also very pleased that there was very little clean up and exposure as opposed to what the situation would have been with a complete roof tear off job.

Recent Roof Restorations

Iskoteen Judicial Complex / Dulce, NM

To repair Minor leaks around roof drains, and penetrations.

LEARN MORE >

Terraces at Paradise Lakes – Land O’ Lakes, FL

The 10-year Warranty on the existing acrylic coating system that was on the roof had expired.

LEARN MORE >

Los Feliz Towers

The existing SPF foam with Acrylic coating was beginning to fail.

LEARN MORE >

Plantation Golf & Country Club – Venice, FL

Leaks in around penetration area and perimeter of parapet walls.

LEARN MORE >

Mandalay Beach Club Condo Towers

The modified bitumen was nearing the end of its life cycle and still in sound condition to restore/extend the life of the roof.

LEARN MORE >

Custom Mobility Inc.

The mod-bit roof was nearing the end of its life cycle and showing heavy granule loss in certain areas.

LEARN MORE >

Beach Condominiums – Florida

The building owner wants to prolong the life of their roof while mitigating potential for leaks. After analysis of the existing roof condition…

LEARN MORE >

The Turtle Dome House (Residential)

There were several cracks in the concrete exterior and the green paint on the concrete…

LEARN MORE >

Cushman & Wakefield / Miami, FL

This roof was in very poor condition and the options other than tearing off were extremely limited.

LEARN MORE >

David Franklin Residence

SPF Roof, with Old acrylic coating. Acrylic coating was flaking off, and had some moisture…

LEARN MORE >