PROJECT PROFILE

Full foam restoration

PROJECT PROFILE

Full foam restoration

Project Description

11,000 sq ft of a failing pre-existing metal system, made into a completely monolithic water-proof system

Project Details

Project Size/Substrate

11,000 sq ft metal system

Condition

Pre-existing failed metal roofing system

Video: NW Glass - TRT: 49sec

Materials Used

COATINGS

LEARN MORE >

TRP #924 Direct Bond Silicone

COATINGS

LEARN MORE >

TRP #901 High Solids Elastomeric Roof Coating

Outcome

Full foam hybrid restoration to completely waterproof the roof.

Recent Roof Restorations

Iskoteen Judicial Complex / Dulce, NM

To repair Minor leaks around roof drains, and penetrations.

LEARN MORE >

Terraces at Paradise Lakes – Land O’ Lakes, FL

The 10-year Warranty on the existing acrylic coating system that was on the roof had expired.

LEARN MORE >

Los Feliz Towers

The existing SPF foam with Acrylic coating was beginning to fail.

LEARN MORE >

Plantation Golf & Country Club – Venice, FL

Leaks in around penetration area and perimeter of parapet walls.

LEARN MORE >

Mandalay Beach Club Condo Towers

The modified bitumen was nearing the end of its life cycle and still in sound condition to restore/extend the life of the roof.

LEARN MORE >

Custom Mobility Inc.

The mod-bit roof was nearing the end of its life cycle and showing heavy granule loss in certain areas.

LEARN MORE >

Beach Condominiums – Florida

The building owner wants to prolong the life of their roof while mitigating potential for leaks. After analysis of the existing roof condition…

LEARN MORE >

The Turtle Dome House (Residential)

There were several cracks in the concrete exterior and the green paint on the concrete…

LEARN MORE >

Cushman & Wakefield / Miami, FL

This roof was in very poor condition and the options other than tearing off were extremely limited.

LEARN MORE >

David Franklin Residence

SPF Roof, with Old acrylic coating. Acrylic coating was flaking off, and had some moisture…

LEARN MORE >